Skip to main content
sales@mediastorehouse.co.uk
Framed Pictures, Canvas Prints
Posters & Jigsaws since 2004
verified_user
All orders are protected by
our Pixel Perfect Guarantee
local_shipping
Fast, Safe Delivery
and Easy Returns

Jigsaw Puzzle of Heritage at Risk Register 2013

Heritage at Risk Register 2013

Heritage at Risk Register 2013
EDS NOTE: IMAGE TAKEN WITH FISHEYE LENSNorth Leverton Windmill in Leverton, Lincolnshire which has been rescued and removed from the English Heritage at Risk Register, because of the rescue the Mill celebrates 200 years of continuous wind powered milling.

Customise Your Product

£27.99

Dispatched in 9-10 working days
Get it as soon as 17th August

check Made in UK
check Pixel Perfect Reproduction
check Made with high-grade materials
check Carefully packed to aid safe arrival
check Delivery from only £5.99

Most popular orders
of this image
14"x12" (38x32cm) Framed Print of heritage risk register 2013
Framed Print
Select this product
10"x8" (25x20cm) Print of heritage risk register 2013
Photographic Print
Select this product
A1 (84x59cm) Poster of heritage risk register 2013
Poster Print
Select this product
info Info
style Choices
rate_review Reviews
local_shipping Delivery
verified_user Pixel Perfect

Jigsaw Puzzle of Heritage at Risk Register 2013

EDS NOTE: IMAGE TAKEN WITH FISHEYE LENSNorth Leverton Windmill in Leverton, Lincolnshire which has been rescued and removed from the English Heritage at Risk Register, because of the rescue the Mill celebrates 200 years of continuous wind powered milling

© PA/Press Association Images

Media ID 11085146

Britaincollectionviewsrural

Jigsaw Puzzle (400 Pieces)

Photo Puzzles are an ideal gift for any occasion

check 47.2cm x 31.5cm (18.6"x12.4")
check Pixel Perfect Guarantee
check Made with high-grade materials
check Professional quality finish

400 piece puzzles are made in the UK and hand-finished on 100% recycled 1.5 mm millboard. The completed puzzle measures 31 x 47 cm and is delivered packaged in an attractive presentation box (23.1 X 17.5 X 3.3 cm) specially designed to fit most letterboxes

This picture is available as a Framed Print , Photographic Print , Poster Print , Jigsaw Puzzle , Canvas Print , Metal Print , Photo Mug , Tote Bag , Fine Art Print , Mounted Print , Glass Frame , Acrylic Blox , Classic Framed , Greeting Card , Cushion , Mouse Mat , Glass Place Mat , Glass Coaster , Digital Wallpaper

Watermarking does not appear on finished products

PA Reference Number: 17871216

Full Art Print Range

Regular Photo Prints (ideal for framing) are sent within one working day and all other items in 3-5 working days.

Framed Print (£44.99 - £229.99)
Our contemporary Framed Prints are professionally made and ready to hang on your wall

Photographic Print (£6.99 - £149.99)
Our Photo Prints are printed on sturdy Archival Quality Paper for vivid reproduction and are perfect for framing.

Poster Print (£12.99 - £34.99)
Archival quality poster paper, ideal for printing larger pictures

Jigsaw Puzzle (£27.99 - £37.99)
Photo Puzzles are an ideal gift for any occasion

Canvas Print (£29.99 - £249.99)
Professionally made, ready to hang Canvas Prints are a great way to add colour, depth and texture to any space.

Metal Print (£59.00 - £399.00)
Make your photos come to life with Metal Prints! With durable metal and luxurious printing techniques, add a modern touch to your space.

Photo Mug (£9.99)
Enjoy your favourite drink from a custom printed gift mug. Our mugs are printed with your choice of image

Tote Bag (£29.95)
Our tote bags are made from soft durable fabric and include a strap for easy carrying.

Fine Art Print (£29.99 - £399.99)
The next best thing to owning the original artwork, with a soft textured natural surface, our fine art reproduction prints meet the standard of most critical museum curators.

Mounted Print (£12.99 - £129.99)
Photo prints supplied in custom cut card mount ready for framing

Glass Frame (£22.99 - £69.00)
Tempered Glass Mounts are ideal for wall display, plus the smaller sizes can also be used free-standing via an integral stand.

Acrylic Blox (£29.99 - £49.99)
Streamlined, one sided modern and attractive table top print

Classic Framed (£44.99 - £249.99)
Our original range of UK Framed Prints featuring a bevelled edge

Greeting Card (£5.97)
Personalised cards suitable for Birthday Cards, Wedding and Anniversary Cards, Graduation Cards, Thank You Cards and much more

Cushion (£24.99 - £44.99)
Accessorise your space with decorative, soft cushions

Mouse Mat (£13.99)
Archive quality photographic print in a durable wipe clean mouse mat with non slip backing. Works with all computer mice.

Glass Place Mat (£49.99)
Set of 4 Glass Place Mats. Elegant polished safety glass and heat resistant. Matching Coasters are also available

Glass Coaster (£7.99)
Individual Glass Coaster. Elegant polished safety toughened glass and heat resistant, matching Place Mats are also available

Digital Wallpaper (£2.00)
Download artwork as Desktop Wallpaper